The Scope of this method statement is to define the procedure that will be followed for the installation of the Fire and Gas detection System.
Prior to any works taking place, all operatives will
have been inducted and have been trained on the type of method in which they
are carrying out the installation.
All material or plant deliveries will be carried out
inline with project protocols.
Table of Content of this Procedure is:
1.0 Scope
2.0 Purpose
3.0 Definitions
4.0 References
5.0 Responsibilities
5.1 Project Manager
5.2 ConstructionManager
5.3 HSE Manager
5.4 Safety Officer
5.5 Project Site Engineer
5.6 Site Supervisor/ Foeman
5.7 Quality Control Inspector
5.8 Tradesman
1.0 Scope
2.0 Purpose
3.0 Definitions
4.0 References
5.0 Responsibilities
5.1 Project Manager
5.2 ConstructionManager
5.3 HSE Manager
5.4 Safety Officer
5.5 Project Site Engineer
5.6 Site Supervisor/ Foeman
5.7 Quality Control Inspector
5.8 Tradesman
6.0 Equipment Tools
7.0 Materials
8.0 PPE
9.0 Safety
10.0 Safety Procedure
11.0 Operational Procedure
12.0 Inspection & Testing
13.0 Attachments
13.1 Forms
13.2 Documents
13.3 Records